PCB, copper & laminate supply update – FR-4 now under pressure

Since our September update, conditions have tightened further. Glass cloth remains the bottleneck and prices continued to rise every month. Standard FR-4 is now being squeezed as laminate capacity continues to move to advanced material with ultra-low loss for high-speed communication technology, targeting the AI-related products.

 

Author: Raymond Goh, COO, Confidee

What is the status? 

Our own experience in recent weeks shows what the graphs are indicating: longer lead times and difficulty securing supply as AI absorbs scarce capacity, effectively putting production at risk. 

  • Several leading laminate suppliers continue to reduce their capacity allocation to FR-4 and focus on advanced materials.
  • Panasonic has shifted manufacturing capacity away from standard FR-4 toward AI-driven high-speed laminates (such as the MEGTRON series), contributing to industry-wide FR-4 end-of-life (EOL) notices and tightening supply.
  • Others remain unavailable to the general market, or only on very long lead times.


Availability now differs by supplier, product and glass style, and can change within weeks. The question of whether you have availability is more important than what the cost is. Most PCB suppliers are getting their allocations cut, with no warning and little room for negotiation.

The alternatives for standard FR-4 are narrowing, increasing the importance of equivalent laminates and prepregs, where technically acceptable. It also increases the advantage of defining the performance attributes you need, rather than a single material.


Material challenges 

FR-4 itself has not changed, but it now competes with AI materials for the same glass cloth, copper foil and press capacity, and those products earn laminate makers more.

Low-loss laminates (MEGTRON class) are moving up to MEGTRON 7 and 8 grades for AI servers and switches. These grades rely on low-Dk glass cloth and HVLP copper foil, both tight. On 4 November, a fire at Panasonic's Hukou plant in Taiwan, a key MEGTRON site, put an estimated 4% of global high-end CCL supply at risk. No restart date has been published.

Laminate prices increasingly depend on glass style. In October, one of the largest laminate makers raised prices by 15% on laminate and prepreg using 2116 or thinner glass cloth. Another leading maker is reported to be planning a further 15% increase on laminates and 25% on prepreg from November, which has not yet been confirmed. At the low end, some smaller laminate manufacturers are finding it hard to maintain consistent supply as they relied on the established laminate suppliers for the glass cloth.


Copper and copper foil 
 
Copper has eased: LME copper fell from USD 14,449 per tonne on 30 October to USD 12,570 on 19 November. This has not slowed laminate prices, which are now driven by glass cloth and capacity rather than metal. Heavy copper requiring more than 2oz continued to be tight. Processing fees for high-end HVLP copper foil have risen 30–50% since December 2025, and major new foil capacity is not due until 2031.

Resin. No new verified price data this month. Electronic-grade epoxy has stayed elevated through 2026, and resin for high-speed laminates remains tight.


Drill bits – do they follow? 

Consumables are rising too. PCB drill bits rose by more than 50% from late 2025 to the third quarter of 2026, as demand for tungsten carbide drill bits increased tremendously. As the PCB layers increase, the drill hits or lifespan of the drill bits decreases.


Is AI demand slowing? 

Reports of slowing data centre projects point to power, environmental permits and water supply, not falling demand. We still see high intake of advanced materials for data centres and AI-related products.


Prices and lead times 

Laminate and prepreg prices are now 3.5 to 4.5 times their January 2025 level, based on general market updates from the producers for TG150 1.5 mm H/H laminate and 7628 prepreg. Prices were broadly flat through most of 2025, took off from March 2026, and have risen almost every month since.

Material (index, January 2025 = 100) Dec 2025 Nov 2026 Change since Jan 2025 
FR-4 laminate (Tg150), supplier A147451+351% 
FR-4 laminate (Tg150), supplier B126348+248%
7628 prepreg110405+305%


7628 prepreg rose fastest in 2026. 7628 is one of the most widely used prepreg styles in standard multilayer boards. Its price was flat until autumn 2025 and only 10% above January 2025 by December. Since then, it has risen 3.7 times, faster than either laminate, in step with 7628 glass cloth.

These trends match the wider market. One leading laminate maker has issued 12 price increases since February 2025, reported at about +230% cumulatively. Our index reflects actual purchase prices, which can differ from published list-price increases.


What this means for PCB prices  

Laminate and prepreg are among the largest material costs in a finished board, and copper foil, glass cloth and resin all sit upstream of them. When these inputs rise three to four times, PCB prices cannot stay where they were. Across the industry, PCB manufacturers have raised prices through 2026 as material costs pass down the chain. Official US producer prices for bare PCBs, for example, were 45% higher in August 2026 than a year earlier. 

This is an industry-wide cost shift, not a single supplier's decision. Finished-board prices typically rise less than the materials themselves, because materials are only part of a board's cost. The increase also depends on the stack-up: boards built on thin glass styles or prepreg-heavy constructions are affected most.

The Global Electronics Association reports lead times of 16–20 weeks or more for high-layer PCBs and does not expect meaningful relief before mid-2028. We expect FR-4 lead times to become longer and less predictable, and pricing to remain material-dependent into 2027, with shorter quotation validity.


We recommend

  • Allow equivalent laminates and prepregs, including for FR-4, where technically acceptable.
  • Define the performance attributes you need rather than a single material.
  • Use the IPC Slash Code or Slash Sheet to select a material equivalent group, such as IPC 4101/ XXX.
  • Review whether thin glass styles or low-loss materials are strictly necessary and qualify alternatives now.
  • Release orders early, based on real demand, and avoid duplicate orders.
  • Share realistic forecasts covering for the rest of 2027 already now.
  • Plan budgets for higher PCB prices in 2027 and expect quotations to follow material costs more closely than before.


At Confidee, we often say: define the attributes you need, not the exact material. We will continue to provide transparency, documentation and close communication, so our partners can secure supply with as much predictability as today's market allows.