Ad
Ad
Ad
Ad
Ad
Ad
Ad
Ad
Rousset-aerial-view
© STMicroelectronics
Business |

ST invests more than €100 million in its Rousset fab

STMicroelectronics is investing more than EUR 100 million to expand production at its site in Rousset in southern France. The clean room will grow by 1,000 square metres, and automation of production flows will be increased.

The investment programme started in 2025 as part of ST’s plan to reshape its manufacturing footprint, and runs through 2027, according to a press release from the company. The 200 mm clean room will grow from 10,000 to 11,000 square metres, making room for new machines and upgraded equipment, with the aim of increasing productivity and volumes.

The automation part of the programme extends the site’s overhead transport system for wafer lots. Another 700 metres of rails are being added to the existing 900 metres, allowing lots to travel up to 30 kilometres a day. Combined with smarter production control and connected process monitoring, ST expects the change to make production more predictable, efficient and responsive.

“The expansion of our clean room will strengthen our production capabilities and support the ramp-up of our activities with an even more high-performing industrial tool. These changes open new prospects for ST Rousset and for our teams, by creating opportunities for skills development and career progression,” says Philippe Marc, site director of ST Rousset.

The expansion has already created 100 new positions, filled through external recruitment or internal moves, and around 40 engineer and technician positions remain to be filled. ST is also training existing staff for roles in areas such as automation, process control and equipment supervision.

Rousset is one of ST’s four manufacturing plants in France. The site, established in 1979, employs around 3,000 people and combines design, R&D, 200 mm wafer manufacturing and electrical testing. 


Ad
Ad
Load more news
© 2026 Evertiq AB November 19 2026 9:54 am V32.0.0-1
Ad
Ad